Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Jan De Nul enlarges ‘Dubai of Brazil’ beaches
Infrastructure

February 25, 2022 · about 4 years ago

Jan De Nul enlarges ‘Dubai of Brazil’ beaches

Balneário Camboriú, also known as BC, Rio de Janeiro’s kid brother or the Dubai of Brazil, is one of the most important cities in the southern part of the country. The city has a population of about 145.000 inhabitants, yet during the summer months, this can easily exceed 1,000,000. Many Brazilians

2 minutes read
  • LinkedIn
  • X
  • Email
Jan De Nul enlarges ‘Dubai of Brazil’ beaches

Balneário Camboriú, also known as BC, Rio de Janeiro’s kid brother or the Dubai of Brazil, is one of the most important cities in the southern part of the country.

The city has a population of about 145.000 inhabitants, yet during the summer months, this can easily exceed 1,000,000. Many Brazilians spend their holidays there because of the beautiful bay that stretches over 5.8 km and the impressive skyline, featuring some of the tallest buildings in Latin America.

Because of these immense skyscrapers and a beach that is only a couple of meters wide at some points, large portions of the beach are in the shadows for the larger part of the day.

That aside, the city also wanted to counteract on further coastal erosion and at the same time create more space for parks, sports infrastructure and places to eat and drink by enlarging the beach surface.

Which is why the city has decided to enlarge the beach area over the whole length of the bay.

For this project, Jan De Nul has mobilised its trailing suction hopper dredger (TSHD) Galileo Galilei and its multicat DN38.

The dredger with a hopper capacity of 18,000m3 arrived at its very first project in August 2021.

What is so special about this vessel and makes it unique in Jan De Nul’s hopper fleet, is that it actually consists of two separate hoppers. This means the dredged material can be divided equally amongst both hoppers, thus optimising control over the vessel’s load and draught.

Upon arrival, Galileo Galilei went straight to work, dredging sand at 15 km from the coast and bringing it into the bay, where the sand was pumped onto the beach through a sinker line.

In order to restore the 5.8 km beach and expanding it from its current width of 25m to 70m, Jan De Nul has been pumping sand for about nine weeks straight.

This was perfectly timed to be able to receive all the tourists in December 2021, at the start of the Brazilian summer season, said Jan De Nul.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago