Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Putting finishing touches on TSHD Hegemann V
Equipment

March 9, 2022 · about 4 years ago

Putting finishing touches on TSHD Hegemann V

The finishing touches on the Hegemann Dredging’s new trailing suction hopper dredger (TSHD) Hegemann V are in full swing now. At the moment, the TSHD is pulled out on the Kooiman Marine Group’s slipway in Zwijndrecht. The newbuild, developed by Kooiman in a collaboration with Hegemann, is designed t

1 minutes read
  • LinkedIn
  • X
  • Email
Putting finishing touches on TSHD Hegemann V

The finishing touches on the Hegemann Dredging’s new trailing suction hopper dredger (TSHD) Hegemann V are in full swing now.

At the moment, the TSHD is pulled out on the Kooiman Marine Group’s slipway in Zwijndrecht.

The newbuild, developed by Kooiman in a collaboration with Hegemann, is designed to execute multiple types of dredging activities on specific locations.

With a suction tube on the starboard side and an inboard dredge pump, she can load 1500m3 of material. Unloading the dredged material can be done by opening a row of bottom doors.

In addition, the material can be pumped by one or two series-connected dredge pumps with discharge connections on both sides of the ship or via a bow connection at the front.

Delivery of the 75.9 meter long dredger is expected to take place later this year.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago