Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›DELWP wrapping up beach renourishment at St Leonards
Operations & Maintenance

April 8, 2022 · about 4 years ago

DELWP wrapping up beach renourishment at St Leonards

The Department of Environment, Land, Water and Planning in Victoria is wrapping up another coastal erosion project on the Bellarine Peninsula – the beach renourishment at Lower Bluff. According to DELWP, this is the latest in a series of beach renourishments on the northern Bellarine Peninsula, with

1 minutes read
  • LinkedIn
  • X
  • Email
DELWP wrapping up beach renourishment at St Leonards

The Department of Environment, Land, Water and Planning in Victoria is wrapping up another coastal erosion project on the Bellarine Peninsula – the beach renourishment at Lower Bluff.

According to DELWP, this is the latest in a series of beach renourishments on the northern Bellarine Peninsula, with almost 30,000 cubic metres of sand having been distributed across four beaches at Indented Head and St Leonards over the last two years.

The beach renourishment at Lower Bluff is designed to avoid further erosion at the site, caused by severe storms and rising sea levels attributed to climate change, the department said.

By increasing the width of the beach along a 200-metre stretch, the works will provide protection for infrastructure behind the foreshore, including the low-lying coastal trail.

The new sand has been sourced from the seabed of Point Richards Harbour, where excess sand has naturally accumulated over time.

This was a joint effort between DELWP and the Bellarine Bayside Committee of Management who worked together to plan, design and coordinate these works, with input from the community.

DELWP delivered the works as part of the Victorian Government’s $8 million Port Phillip Bay Beaches Renourishment Program.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago