Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Construction on track for GLDD’s new hopper dredger
Vessels

April 15, 2022 · about 4 years ago

Construction on track for GLDD’s new hopper dredger

Great Lakes Dredge & Dock newest trailing suction hopper dredge being built at Conrad Shipyards is progressing as planned with the vessel being on track for an on-time delivery on Q1 of 2023. This 6,500-cubic-yard-capacity hopper dredge will feature two 800mm suction pipes and will be able to dredge

1 minutes read
  • LinkedIn
  • X
  • Email
Construction on track for GLDD’s new hopper dredger

Great Lakes Dredge & Dock newest trailing suction hopper dredge being built at Conrad Shipyards is progressing as planned with the vessel being on track for an on-time delivery on Q1 of 2023.

This 6,500-cubic-yard-capacity hopper dredge will feature two 800mm suction pipes and will be able to dredge at depths of up to 100 feet, with principal dimensions of approximately 346 feet in length, 69 feet in breadth and 23 feet in depth and total installed horse power of 16,500.

The newbuild will be equipped with a direct high power pump-ashore installation, dredging system automation, dynamic positioning and tracking, US EPA Tier IV compliant engines, and additional features designed to minimize the impact of its dredging process on the environment.

According to Lasse Petterson, Chief Executive Officer and President of GLDD, this highly automated vessel will increase the capabilities of the company’s hopper fleet in the coastal protection and maintenance markets as well addressing specific needs in the growing offshore wind market.

Also worth mentioning is that this C-Job designed TSHD will be the first US registered, ABS classed, compliant with the USCG Alternate Compliance Program, and receiving a DR-68 reduced freeboard assignment.

Having a DR-68 reduced freeboard assignment will allow the TSHD to increase its payload beyond its load line while maintaining an equivalent level of safety. The TSHD will be capable of dredging operations both in the US as well as internationally.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

13 days ago