Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›FueLNG completes bunkering of LNG TSHD Vox Ariane
Equipment

April 25, 2022 · about 4 years ago

FueLNG completes bunkering of LNG TSHD Vox Ariane

FueLNG Private Limited has just completed the bunkering of the Van Oord’s new trailing suction hopper dredger (TSHD) Vox Ariane. This marks the first dredger bunkered by the FueLNG Bellina and extends their track record in providing safe and reliable ship-to-ship bunkering for a wide range of vessel

1 minutes read
  • LinkedIn
  • X
  • Email
FueLNG completes bunkering of LNG TSHD Vox Ariane

FueLNG Private Limited has just completed the bunkering of the Van Oord’s new trailing suction hopper dredger (TSHD) Vox Ariane.

This marks the first dredger bunkered by the FueLNG Bellina and extends their track record in providing safe and reliable ship-to-ship bunkering for a wide range of vessels.

FueLNG also carried out the gassing up and cooling down of the Vox Ariane earlier in March and provided LNG for the vessel’s commissioning operations.

Recently delivered by Keppel Offshore & Marine, the Vox Ariane is the first dual-fuel dredger built in Singapore and the first of three identical dredgers that Keppel O&M is building for Van Oord.

Built to the requirements of the International Maritime Organisation’s (IMO) Tier III regulations, the Dutch flagged dredger includes several features that considerably reduce fuel consumption and carbon emissions.

Also, the TSHD incorporates innovative and sustainable systems and has obtained the Green Passport and Clean Ship Notation by Bureau Veritas.

According to Van Oord, the Vox Ariane has one suction pipe with submerged e-driven dredge pump, two shore discharge dredge pumps, five bottom doors, a total installed power of 14,500 kW, and is able to accommodate 22 persons.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

EquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago