Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Port MacDonnell Harbor dredging moves forward
Business development

May 9, 2022 · about 4 years ago

Port MacDonnell Harbor dredging moves forward

Dredging works are currently in progress at Port MacDonnell Harbor to improve safety and access to the harbor, boat ramp and mooring ground, the Government of South Australia said. The project will remove a significant accumulation of sandy materials at the harbor entrance and mooring grounds as wel

1 minutes read
  • LinkedIn
  • X
  • Email
Port MacDonnell Harbor dredging moves forward

Dredging works are currently in progress at Port MacDonnell Harbor to improve safety and access to the harbor, boat ramp and mooring ground, the Government of South Australia said.

The project will remove a significant accumulation of sandy materials at the harbor entrance and mooring grounds as well as a build-up of seaweed inside the (harbor) channel, improving safety and access to the harbor, boat ramp and mooring ground for all boat users.

Organic materials dredged from the channel are being screened, drained, and progressively transported to the adjacent western beach or if causing too great a disturbance, offsite to the local transfer station.

Due to the presence of fine organic sludge in the seabed, fresh seaweed wrack is being removed first using a seaweed wrack screen where wrack will be progressively collected and removed.

Following this, sludge will be pumped into geobags which filter sediment and allow silt free water to be released to drain.

Both methods will require temporary space on the park directly east of the boat ramp to enable a good working area with drainage.

This temporary works area will be required for approximately two months.

The area will be landscaped, and grass re-established at the end of the project.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago