Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Modified Upper Pool 4 island project available for public review
Authorities & Government

May 11, 2022 · about 4 years ago

Modified Upper Pool 4 island project available for public review

The U.S. Army Corps of Engineers, St. Paul District is seeking public comments on its draft Supplemental Environmental Assessment (EA), released May 11, for proposed modifications to the Pierce County Islands in Upper Pool 4 of the Mississippi River. USACE officials initiated a feasibility study in

2 minutes read
  • LinkedIn
  • X
  • Email
Modified Upper Pool 4 island project available for public review

The U.S. Army Corps of Engineers, St. Paul District is seeking public comments on its draft Supplemental Environmental Assessment (EA), released May 11, for proposed modifications to the Pierce County Islands in Upper Pool 4 of the Mississippi River.

USACE officials initiated a feasibility study in 2017 to identify steps that could be taken to improve the habitat in Upper Lake Pepin, particularly in Catherine Pass.

These measures include islands, water level management structures, overwintering dredging and shoreline protection. The proposed solutions are designed to work together to reduce sediment and increase water clarity within the area.

The features include four islands, refuge dredging, a water level management dike and control structure, an access road, two backwater dredged areas, three areas of shoreline protection, a mudflat, access dredging and a partial closure of Catherine cut.

Detailed engineering and design studies conducted since the completion of the Integrated Feasibility Report and Environmental Assessment in 2020 resulted in several proposed modifications to the project.

The modifications identified since the IFR/EA include: two additional mudflats with berms and rock protection, creation of four pothole wetlands and additional access dredging.

A supplemental EA and Supplemental Clean Water Act Section 404(b)(1) evaluation have been prepared to address the potential effects associated with the proposed modifications.

The draft documents describing the project and the environmental impacts in detail are available to the public online .

The deadline for sending comments on the proposed work is June 11.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Authorities & Government

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The Gulf Coast’s draft 2026 FPL released for public comment
Authorities & Government

The Gulf Coast’s draft 2026 FPL released for public comment

about 8 months ago

Queensland Government unlocking Port Hinchinbrook full potential
Authorities & Government

Queensland Government unlocking Port Hinchinbrook full potential

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The Gulf Coast’s draft 2026 FPL released for public comment
Authorities & Government

The Gulf Coast’s draft 2026 FPL released for public comment

about 8 months ago
Queensland Government unlocking Port Hinchinbrook full potential
Authorities & Government

Queensland Government unlocking Port Hinchinbrook full potential

about 8 months ago