Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Dredging works underway at Chelydra Beach
Operations & Maintenance

June 15, 2022 · about 4 years ago

Dredging works underway at Chelydra Beach

The WA Department of Transport (DoT) announced recently that dredging works at Chelydra Beach (north of the Port Coogee marina) commenced in early June 2022 and will proceed until approximately mid July 2022. The works are being carried out by the 18m cutter suction dredge ‘Mudlark I’ from Monday to

1 minutes read
  • LinkedIn
  • X
  • Email
Dredging works underway at Chelydra Beach

The WA Department of Transport (DoT) announced recently that dredging works at Chelydra Beach (north of the Port Coogee marina) commenced in early June 2022 and will proceed until approximately mid July 2022.

The works are being carried out by the 18m cutter suction dredge ‘Mudlark I’ from Monday to Saturday between the hours of 0700 and 1800hrs.

During the works, the dredge will be equipped with a floating pipeline that runs directly behind the dredge and which will be marked by yellow buoys with flashing yellow lights.

The floating pipeline transitions to a submerged pipeline which will run along the seabed and cross the Port Coogee entrance channel.

According to DoT, the dredged sand will be used for beach replenishment. This will manage beach erosion at Coogee Beach & C.Y. O’Connor Beach.

For the first half of the works, dredged material will be discharged at the southern disposal site at South Coogee Beach.

During the second half of the project, dredged sand will be discharged to the northern disposal site, just south of the Catherine Point groyne.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago