Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Muddy River dredging continues
Operations & Maintenance

June 24, 2022 · about 4 years ago

Muddy River dredging continues

Work continues on Phase 2 of the $36.5 million Muddy River flood mitigation project, which includes dredging of sediment to improve the hydraulic capacity of the river and reduce flood levels. Phase 2 of the Muddy River project is located between Leverett Pond to Boylston Street in Boston and Brookl

1 minutes read
  • LinkedIn
  • X
  • Email
Muddy River dredging continues

Work continues on Phase 2 of the $36.5 million Muddy River flood mitigation project, which includes dredging of sediment to improve the hydraulic capacity of the river and reduce flood levels.

Phase 2 of the Muddy River project is located between Leverett Pond to Boylston Street in Boston and Brookline. The major project components involve dredging 1 to 8’ of sediment for flow conveyance in the Back Bay Fens and the Riverway sections of the Muddy River, and excavation of the sandbar and island at Leverett Pond.

The dredging is divided into 12 work areas, with 6 work areas upstream of the Riverway and 6 work areas downstream of Ave. Louis Pasteur. At this time, the contractor is dredging in Work Area #6.

Work Areas #5 and #6 include sections of the river by Short Street Bridge to Back Bay Yard – near the intersection of Park Drive and Riverway.

According to the Corps, approximately 85% of the dredging has been completed so far, and restoration efforts of the streambanks are also in full swing.

USACE added that almost half of the sediment dredged from Muddy River is being shipped to a landfill reclamation project being used to restore and preserve the historic waterfront in Lynn, MA.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago