Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›DPWH to speed up dredging of Dupinga River
Authorities & Government

July 7, 2022 · about 4 years ago

DPWH to speed up dredging of Dupinga River

The Department of Public Works and Highways (Philippines) is continuously working to increase the carrying capacity of Dupinga River in Gabaldon, Nueva Ecija, by conducting dredging activities along the river’s Dupinga-Calabasa section. DPWH’s Bureau of Equipment (BOE) is working closely with the DP

1 minutes read
  • LinkedIn
  • X
  • Email
DPWH to speed up dredging of Dupinga River

The Department of Public Works and Highways (Philippines) is continuously working to increase the carrying capacity of Dupinga River in Gabaldon, Nueva Ecija, by conducting dredging activities along the river’s Dupinga-Calabasa section.

DPWH’s Bureau of Equipment (BOE) is working closely with the DPWH Nueva Ecija 2nd District Engineering Office (DEO) in implementing the dredging project.

According to DPWH-BOE Director Toribio Noel L. Ilao, an additional articulated dump truck was deployed to the Nueva Ecija area to help expedite dredging operations in the river.

The recently-provided unit complements the existing heavy equipment on the project site that includes one unit each of wheel backhoe, crawler-type backhoe, vibratory roller, dump truck and two bulldozers.

As reported by DPWH, Secretary Manuel M. Bonoan has instructed the crews to undertake most appropriate measures in preparation for the rainy season including deployment of more equipment to speed up the ongoing dredging works in the area.

The aim of DPWH is to remove approximately 2 million cubic meter of sediments and other silt materials from the waterway to deepen its stream by six meters and ensure the unrestricted waterflow in the river.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Authorities & GovernmentOperations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The Gulf Coast’s draft 2026 FPL released for public comment
Authorities & Government

The Gulf Coast’s draft 2026 FPL released for public comment

about 8 months ago

Queensland Government unlocking Port Hinchinbrook full potential
Authorities & Government

Queensland Government unlocking Port Hinchinbrook full potential

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The Gulf Coast’s draft 2026 FPL released for public comment
Authorities & Government

The Gulf Coast’s draft 2026 FPL released for public comment

about 8 months ago
Queensland Government unlocking Port Hinchinbrook full potential
Authorities & Government

Queensland Government unlocking Port Hinchinbrook full potential

about 8 months ago