Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Jenkins Marine dredging at Ashlett Sailing Club
Operations & Maintenance

July 26, 2022 · about 4 years ago

Jenkins Marine dredging at Ashlett Sailing Club

Jenkins Marine has been busy lately dredging at Ashlett Sailing Club near Calshot, Southampton, to restore the waterways to previously maintained depths. The project calls for up to 2m depth of material to be removed, with disposal to Nab Tower spoil ground to the East of the Isle of Wight. On site

1 minutes read
  • LinkedIn
  • X
  • Email
Jenkins Marine dredging at Ashlett Sailing Club

Jenkins Marine has been busy lately dredging at Ashlett Sailing Club near Calshot, Southampton, to restore the waterways to previously maintained depths.

The project calls for up to 2m depth of material to be removed, with disposal to Nab Tower spoil ground to the East of the Isle of Wight.

On site is the versatile, self-propelled, spud leg pontoon, Doreen Dorward with her large clear working deck area and a 50t long reach excavator equipped with the 3D RTK GPS positioning Prolec digital dredging system.

“She is perfect for near shore precision operations such as this. Also attending is our 300t, self-propelled, split hopper barge Nab, greatly assisted with the addition of her new 360 degree flush mounted bow thruster. This combination allows for an optimised, tried and tested dredge solution where access in and around marinas is limited,” said Jenkins Marine.

According to Jenkins, the water depth at the Ashlett Sailing Club is extremely shallow with a risk of drying out. Dredging work here is only possible on the end of the high seasonal tides. This makes the dredging operations very challenging with meticulous planning and monitoring needed.

There is approximately 4,000m3 of material to be removed here during the summer campaign.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago