Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Removing fragmented rock from South Port harbour entrance channel
Business development

October 7, 2022 · about 3 years ago

Removing fragmented rock from South Port harbour entrance channel

On 8 August, South Port NZ contracted Heron Construction Company Ltd operating under an existing coastal permit, to remove fractured or fragmented rock that remained in the Port harbour entrance channel from previous dredging campaigns. This project commenced on 21 August and was expected to be comp

2 minutes read
  • LinkedIn
  • X
  • Email
Removing fragmented rock from South Port harbour entrance channel

On 8 August, South Port NZ contracted Heron Construction Company Ltd operating under an existing coastal permit, to remove fractured or fragmented rock that remained in the Port harbour entrance channel from previous dredging campaigns.

This project commenced on 21 August and was expected to be completed towards the end of September 2022.

As noted at the time, there were several variables associated with a project such as this, foremost of which was the uncertainty of the extent of the fragmented rock and therefore the timeline was subject to change.

It was also noted that the proposed six-week clearance work did not include any blasting activity.

According to South Port, this dredging campaign has been very successful and with the support from Heron Construction this work will continue into early October.

Also, this dredging campaign will achieve 9.7m chart datum (CD) in the harbour entrance channel.

This is a significant milestone as this is the depth that was targeted for project Kia Whakaū, the subject of the resource consent that was granted on 31 August 2022 (notified to NZX on 1 September 2022).

Kia Whakaū is a project to dredge and remove seabed materials to 9.7m CD in the harbour entrance channel, which included the use of drilling and blasting as required, 10.7m CD in the Island Harbour berth basins, and 9.45m CD in the swinging basin.

South Port will now contract a suction dredge to deepen the swinging basin and berth pockets under the new resource consent, which is expected to be completed in July 2023 to allow for larger cargo volumes and or vessels to transit through the Port.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago