Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Van Oord ready for the Dublin Port campaign
Infrastructure

October 11, 2022 · about 3 years ago

Van Oord ready for the Dublin Port campaign

Van Oord and Dublin Port Company (DPC) are about to begin work on a Capital Dredging campaign in order to create two new riverside berths. As disclosed by DPC, the contractor intends to carry out loading and dumping at sea of dredged material arising from capital dredging as part of the MP2 Project

1 minutes read
  • LinkedIn
  • X
  • Email
Van Oord ready for the Dublin Port campaign

Van Oord and Dublin Port Company (DPC) are about to begin work on a Capital Dredging campaign in order to create two new riverside berths.

As disclosed by DPC, the contractor intends to carry out loading and dumping at sea of dredged material arising from capital dredging as part of the MP2 Project over the period October to December 2022.

The MP2 Project is the second Strategic Infrastructure Development Project to be brought forward for planning from Dublin Port’s Masterplan 2040, reviewed 2018. An Bord Pleanála granted Planning Permission for the MP2 Project on 1st July 2020 (ABP-304888-19).

The areas to be dredged during the 2022 campaign all lie within Dublin Harbour and comprise the creation of the new Berth 52 and Berth 53, and localised widening of the navigation channel in the vicinity of the Poolbeg Oil Jetty.

The dredged material – consists of a mixture of clay, silt, sand, gravel and cobbles – will be disposed of at the existing licensed offshore disposal site located at the entrance to Dublin Bay to the west of the Burford Bank, (6.75 km from the lighthouse at the end of the Great South Wall).

Dredging will be carried out using a combination of a backhoe dredger and a trailer suction hopper dredger together with support vessels.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago