Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›VIDEO: Dredge Potter pipeline positioning
Equipment

November 22, 2022 · about 3 years ago

VIDEO: Dredge Potter pipeline positioning

The U.S. Army Corps of Engineers, St. Louis District, has released this very interesting video named ‘Dredge Potter pipeline positioning’. The St. Louis District, Dredge Potter can move 50,000 cubic yards per day of alluvial materials from the bottom of the river bed and send the material long dista

1 minutes read
  • LinkedIn
  • X
  • Email
VIDEO: Dredge Potter pipeline positioning

The U.S. Army Corps of Engineers, St. Louis District, has released this very interesting video named ‘Dredge Potter pipeline positioning’.

The St. Louis District, Dredge Potter can move 50,000 cubic yards per day of alluvial materials from the bottom of the river bed and send the material long distances through a floating discharge pipe.

During operation, the dustpan dredge swings from side to side alternately, using its port and starboard spuds as a pivot, with cables attached to anchors on each side controlling lateral movement.

Built in 1932 during the Great Depression, the Dredge Potter is the Corps’ oldest dredge and was originally launched as a steam-powered vessel.

Today’s Potter is a “dustpan dredge” named for Brigadier General Charles Lewis Potter who was St. Louis District commander from 1910 to 1912, and President of the Mississippi River Commission from 1920 to 1928.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

EXCLUSIVE: Poland launches construction of Cape Pomerania
Business development

EXCLUSIVE: Poland launches construction of Cape Pomerania

13 days ago

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

EXCLUSIVE: Poland launches construction of Cape Pomerania
Business development

EXCLUSIVE: Poland launches construction of Cape Pomerania

13 days ago
Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago