Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Emergency work underway at Hayling Island
Operations & Maintenance

December 4, 2022 · about 3 years ago

Emergency work underway at Hayling Island

Following the severe weather that hit Hayling Island in late November, emergency work is now underway to restore the beach to a high level of protection. To restore the beach profile again, Coastal Partners are undertaking emergency beach recycling works; extracting shingle from Hayling Golf Club la

1 minutes read
  • LinkedIn
  • X
  • Email
Emergency work underway at Hayling Island

Following the severe weather that hit Hayling Island in late November, emergency work is now underway to restore the beach to a high level of protection.

To restore the beach profile again, Coastal Partners are undertaking emergency beach recycling works; extracting shingle from Hayling Golf Club land at Gunner Point, and placing the material along the residential frontage at Eastoke.

As reported, the work is likely to take up to 10 days, Monday to Friday; 6am to 10pm. The contractor will work a 10 hour day during these hours, most likely between 7am and 5pm.

The Eastoke peninsula is a densely populated area. The majority of it is low-lying with a record of serious flood incidents prior to 1985. In 1985 the beach nourishment scheme was implemented, creating a man-made beach in front of the now redundant seawall.

Coastal processes are constantly eroding this frontage and without periodic maintenance the redundant concrete seawall would again be exposed. As a result, regular serious flooding of Eastoke would commence, allowing ongoing erosion of the coastline.

To restore beach levels and maintain the standard of protection against coastal flood and erosion risk to the residents of Eastoke, Hayling Island, the contractor will use land-based machinery to transport from 10,000-30,000m3 along the coast. This will raise the beach profile to the recommended 1:2000 year standard of protection.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago