Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Dredging campaigns in Genoa and Savona move forward
Business development

December 19, 2022 · about 3 years ago

Dredging campaigns in Genoa and Savona move forward

Dredging operations are underway across the Ports of Genoa and Savona, with the dual objective to maintain and to deepen the depth alongside quaylines. It is essential to regularly remove the accumulations of sand and sediment – deposited by tide and river flows into the sea – from the navigation ch

2 minutes read
  • LinkedIn
  • X
  • Email
Dredging campaigns in Genoa and Savona move forward

Dredging operations are underway across the Ports of Genoa and Savona, with the dual objective to maintain and to deepen the depth alongside quaylines .

It is essential to regularly remove the accumulations of sand and sediment – deposited by tide and river flows into the sea – from the navigation channels, to ensure safe and easy access to terminal facilities.

Genoa is in the focus of the excavation of a total of 600,000 cubic metres of sediment, equal to the size of 60 football pitches up to 1 metre in height.

In the passenger port, depth alongside the cruise terminal quay of Ponte dei Mille will be boosted to -11 metres and to -10 metres along the ferry terminal wharves.

In Sampierdarena, the draft is planned to increase to up to -14.5 metres along the multipurpose terminals sited in the basin, and taken from -16 to -17 metres in Calata Bettolo and, in conjunction with the construction of the new breakwater, up to -18.5 metres along the navigation channel.

In Savona , dredging operations will be limited to the navigation channel along Calata delle Vele in the cruise port where the depth is set to increase to -11 metres, at the same level as the draft alongside the terminal quayline, to ensure in full safety manoeuvres on the part of the next generation of cruise vessels.

The sediment deposits released during the excavation will be disposed of in the Bulk Alti Fondali Terminal area.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business developmentInfrastructureTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago