Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›All set for Jurien Bay dredging works
Operations & Maintenance

January 16, 2023 · about 3 years ago

All set for Jurien Bay dredging works

Maintenance dredging works at Jurien Bay Boat Harbour are set to commence any day now, announced the Department of Transport WA. Initially scheduled to begin in December, the Jurien Bay dredging campaign was postponed until mid-January. During the works which are expected to last until approximately

1 minutes read
  • LinkedIn
  • X
  • Email
All set for Jurien Bay dredging works

Maintenance dredging works at Jurien Bay Boat Harbour are set to commence any day now, announced the Department of Transport WA.

Initially scheduled to begin in December, the Jurien Bay dredging campaign was postponed until mid-January.

During the works which are expected to last until approximately late-May 2023, around 40,000 cubic metres of material will be dredged from the entrance and deposited offshore in a natural seabed depression.

According to DoT, dredging will mainly occur Monday to Saturday between the hours of 0700 and 1800hrs, with provision to take place on Sundays and overnight, if required.

The works are being carried out by the 18m cutter suction dredge “Mudlark I”, equipped with 1.2km of floating & submerged pipeline marked with yellow buoys, displaying rhythmic flashing lights, DOT said.

Approximately every 2 years, DoT conducts maintenance dredging at the boat harbour to remove accumulated marine sand and seagrass and to restore navigable depths for vessels that use the harbour.

Dredging campaigns completed prior to 2020, included placing of dredged material in a designated area north of the harbour. As a more sustainable solution, DoT is now returning the dredged material offshore into a natural seabed depression.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago