Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Spotlight on Napa River maintenance dredging
Infrastructure

January 24, 2023 · about 3 years ago

Spotlight on Napa River maintenance dredging

Pacific Dredge & Construction (PDC) has won the Napa River Maintenance Dredging project by the U.S. Army Corps of Engineers. The project goal was to make the river deeper back to its original navigational depths, allowing boats to always transit fully throughout the river. The last time the Napa Riv

1 minutes read
  • LinkedIn
  • X
  • Email
Spotlight on Napa River maintenance dredging

Pacific Dredge & Construction (PDC) has won the Napa River Maintenance Dredging project by the U.S. Army Corps of Engineers.

The project goal was to make the river deeper back to its original navigational depths, allowing boats to always transit fully throughout the river.

The last time the Napa River was dredged was in 2016, and it was performed hydraulically.

The scope of work for this maintenance dredging period restricted dredging to a clamshell method only and upland disposal.

To perform this project, Pacific Dredge & Construction used the smaller rig “Horton”, in conjunction with the 300 cu yds scows Thing 1 and Thing 2 along with the In-Harbor tugboat named Cadet.

A subcontractor was hired to perform the upland offloading portion of the project with an E-Crane barge and earth-moving equipment. In conjunction, the County of Napa offered a disposal site to be used for offloading dredged materials and hired a subcontractor to off-haul sediments to their destination.

The dredged material was taken by scows to the temporary off-loading disposal site.

The river is also divided into three Reaches 1, 2, and 3 where working hours are different as the project is conscious of the proximity to commercial & residential properties to minimize disturbance to all of them.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago