Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Utrenny LNG terminal project includes massive dredging operations
Business development

January 26, 2023 · about 3 years ago

Utrenny LNG terminal project includes massive dredging operations

The facilities of Utrenny terminal for LNG and gas condensate built in Sabetta seaport on the Yamal peninsula under the Arctic LNG 2 project are to be put into operation in May 2023, according to the official portal for Russia’s national projects. Equipment for the first technological train of about

2 minutes read
  • LinkedIn
  • X
  • Email
Utrenny LNG terminal project includes massive dredging operations

The facilities of Utrenny terminal for LNG and gas condensate built in Sabetta seaport on the Yamal peninsula under the Arctic LNG 2 project are to be put into operation in May 2023, according to the official portal for Russia’s national projects.

Equipment for the first technological train of about 7 million tonnes in capacity will be delivered to the terminal in autumn.

Shipments of LNG and gas condensate from the Utrenny field on the Gydan Peninsula will begin after the first train undergoes start-up and commissioning procedures.

The Utrenny terminal is section No 2 of Sabetta seaport in the framework of NOVATEK’s Arctic LNG 2 project.

The terminal construction – the federally owned facilities and the reconstruction of the seaway canal – are included into the Comprehensive Plan for Modernization and Expansion of Core Infrastructure (CPMI) until 2024. 5.6-km long and 510-m wide access canal to the Utrenny terminal will ensure navigation in fast and drift ice conditions.

The scope of dredging is estimated at about 60 million cbm and the cost of dredging works at RUB 37.5 billion ($540 million).

Total cost of the LNG terminal is RUB 95.7 billion with the state budget of the Russian Federation covering 70% of the project cost.

The Utrenny terminal will ensure export shipment of 21.6 million tonnes of hydrocarbons under Arctic LNG 2 project which provides for construction of three LNG trains with the total annual capacity of 19.8 mtpa.

Also, the facility will produce at least 1.6 mtpa of stable gas condensate.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago