During the next few weeks, Manson Construction Company will be dredging the entrance to Ventura Harbor as well as the sand trap, located to the West of the channel, and the inner harbor stub channel to the Ventura Keys.
Currently, the dredge is moving approx. 30,000 cubic yards of sand daily, which will assist to replenish harbor beaches effected by winter storms. The sand will be placed on the beach between the South Beach Groin and the Santa Clara River Mouth.

