BESIX and STFA Construction Group have successfully installed the last of nearly 7,200 Xbloc for the reconstruction of a 1,840 long breakwater in the APM Terminals Port of Poti.
“The innovative blocks make the perfect sustainable solution for the project, as they require less material and can be quickly installed, resulting in a lower CO2 footprint and a stronger breakwater,” said BESIX.

