Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Removing volcanic material from Pohoiki Bay through dredging
Infrastructure

April 24, 2023 · about 3 years ago

Removing volcanic material from Pohoiki Bay through dredging

A Draft Environmental Assessment examining a plan restore Pohoiki Bay “to a shape and depth that resembles pre-eruption conditions to the extent possible” is now available. The Pohoiki Boat Ramp Dredging of Volcanic Debris Draft EA was published in The Environmental Notice for April 23. The Hawaiʻi

1 minutes read
  • LinkedIn
  • X
  • Email
WordPress import placeholder

A Draft Environmental Assessment examining a plan restore Pohoiki Bay “to a shape and depth that resembles pre-eruption conditions to the extent possible” is now available.

The Pohoiki Boat Ramp Dredging of Volcanic Debris Draft EA was published in The Environmental Notice for April 23.

The Hawaiʻi Department of Land and Natural Resources, with the help of The Limtiaco Consulting Group, is proposing to restore navigational access to the landlocked boat ramp by removing accumulated material from Pohoiki Bay through excavation and dredging.

The volcanic material “would be placed in areas of new lava or new beach that are away from the ocean”, the document said.

The Kīlauea Volcano eruption of 2018 disrupted the use of the Pohoiki Boat Ramp facility in the Puna District.

Ocean rescue services, commercial fishing, ocean/volcano tours, recreational opportunities, and food sustainability practices of the Puna community are negatively affected by the closure of the boat ramp, which is undamaged but landlocked by accumulated volcanic debris.

The Pohoiki Boat Ramp facility is owned and maintained by the Department of Land and Natural Resources, Division of Boating and Ocean Recreation.

Accumulated material consisting of sand, rock, and cobble currently blocks navigational access to the Pacific Ocean.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago