Great Lakes Dredge and Dock Company continues work on the Avalon beachfill project with sand being pumped from the dredge “Texas” in Townsend’s Inlet.
As of yesterday, the dredge has placed over 300,000 cubic yards of sand on the Avalon beach. GLDD is currently pumping sand at the beach between 14th and 15th streets; beach paths are closed between 12th and 16th streets due to the construction zone.

