Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Spotlight on Port of NEOM, Boskalis in charge of dredging
Infrastructure

May 18, 2023 · about 3 years ago

Spotlight on Port of NEOM, Boskalis in charge of dredging

In line with NEOM’s strategy and the Saudi Ports Authority’s efforts to transform local ports into globally competitive logistics hubs, the management of Duba Port was transferred from national maritime regulator Mawani, to NEOM in 2022. Located in Oxagon, the home of advanced and clean industries i

2 minutes read
  • LinkedIn
  • X
  • Email
Spotlight on Port of NEOM, Boskalis in charge of dredging

In line with NEOM’s strategy and the Saudi Ports Authority’s efforts to transform local ports into globally competitive logistics hubs, the management of Duba Port was transferred from national maritime regulator Mawani, to NEOM in 2022.

Located in Oxagon, the home of advanced and clean industries in NEOM, the port, which is the primary seaport of entry to the northwest of Saudi Arabia, is renamed as Port of NEOM.

Since the transfer, key capabilities have been expanded to match the rising volume of cargo coming into NEOM, including container and general cargo handling.

Contracts for design, dredging and quay wall construction, and cargo handling equipment have been recently awarded.

Jacobs was named as the main design consultant with Moffatt and Nichol, IGO and Trent as main subconsultants; the redesign project, valued at over SAR 180 million, spans terminals, warehouses, rail delivery, infrastructure, a sustainable energy network and more.

To participate in the competitive bidding process for the first phase of the dredging and quay wall tender , a joint venture was formed between BESIX and Modern Building Leaders, who partnered with Boskalis .

BESIX, together with Boskalis, are the first European contractors to be awarded a design and build lump sum contract for over SAR 2 billion with NEOM.

Boskalis will be responsible for the deepening and widening of the main access channel; in line with Oxagon and NEOM’s sustainable ambitions, there will be zero material discharge with recovery and reuse of materials and structures prioritized to construct earthwork platforms for the development of Oxagon.

Also, BESIX-MBL will be responsible for the design and build of over 3km of quay walls of variant types utilizing innovative construction methodologies and materials.

As part of its efforts to reduce the project’s carbon footprint, low carbon steel frames will be used for the construction of the quay walls.

According to an official statement, several crane and container equipment contracts have been awarded to Saudi Liebherr Company Ltd and Shanghai Zhenhua Heavy Industries Company Limited (ZPMC).

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago