Hall Contracting announced today that their Townsville crew has reached the halfway point of the Port of Townsville Channel Upgrade project, having successfully dredged 50% of the total 3.4 million cubic metres of material.
Hall is currently widening the Platypus Channel and Sea Channel, which will allow vessels of up to 300m in length to safely access the port.
