Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Agreement signed for Southwest Coastal Louisiana Risk Reduction Project
Business development

June 22, 2023 · about 3 years ago

Agreement signed for Southwest Coastal Louisiana Risk Reduction Project

The U.S. Army Corps of Engineers and the Coastal Protection and Restoration Authority of Louisiana have signed a partnership agreement for the $6.5 billion Southwest Coastal Louisiana hurricane and storm damage risk reduction and coastal ecosystem restoration project. The project will be cost shared

2 minutes read
  • LinkedIn
  • X
  • Email
Agreement signed for Southwest Coastal Louisiana Risk Reduction Project

Share this article

The U.S. Army Corps of Engineers and the Coastal Protection and Restoration Authority of Louisiana have signed a partnership agreement for the $6.5 billion Southwest Coastal Louisiana hurricane and storm damage risk reduction and coastal ecosystem restoration project.

The project will be cost shared at 65% federal and 35% by CPRA.

An additional $10 million Community Project Funding will be applied toward project’s first restoration features, including six miles of shoreline protection at Rockefeller Refuge.

“Today’s announcement is transformative for the people of Southwest Louisiana who have held strong in the face of some of the worst storms the country has ever seen,” said Gov. John Bel Edwards.

“The formalization of this partnership is a testament to the continued, shared commitment of the State and the Corps to work together to implement projects to help reduce flood risk and storm damage to the people and businesses living and working in the region.”

Twenty-seven structures have cleared all assessments and are ready to be raised with 17 in Vermillion Parish and 10 in Calcasieu Parish.

USACE will host public meetings in late summer 2023, where homeowners can get more information on the project and begin registering for the elevation program.

Structure elevations are expected to begin in June 2024.

The purpose of the Southwest Coastal Project is to implement localized storm surge risk reduction features to reduce hurricane storm surge damage risks to structures in Cameron, Calcasieu, and Vermilion Parishes.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago