Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›The City of Valdez opts for Mud Cat 40E dredge
Equipment

June 22, 2023 · about 3 years ago

The City of Valdez opts for Mud Cat 40E dredge

The City of Valdez, Alaska, just took delivery of a Mud Cat® 40E for their wastewater lagoons. The dredge is pumping bio-sludge with a 1.1 specific gravity sitting at 7% solids in-situ, a distance of 600 ft. (183m) with 4 ft. (1.2m) of terminal elevation at a maximum flow of 900gpm into geotextile

2 minutes read
  • LinkedIn
  • X
  • Email
The City of Valdez opts for Mud Cat 40E dredge

Share this article

The City of Valdez, Alaska, just took delivery of a Mud Cat ® 40E for their wastewater lagoons.

The dredge is pumping bio-sludge with a 1.1 specific gravity sitting at 7% solids in-situ, a distance of 600 ft. (183m) with 4 ft. (1.2m) of terminal elevation at a maximum flow of 900gpm into geotextile filter bags.

The 40E is dredging to a depth of 14 ft. (4.26m) and the HDPE lagoon liner is protected with the Mud Cat 40E’s standard liner protection wheels which safely press the liner down as the cutter removes the sludge down to the bottom of the lagoon.

Also, the dredge creates an even bottom profile due to its horizontal auger cutterhead which is more efficient for tracking cuts.

“The City of Palmer, Alaska who has successfully been operating their Mud Cat 40E for three years, referred the City of Valdez to us. We continue to lead the electric remote control dredge sector with by providing the most durable systems in the world that create even bottom profiles and excavate in even parallel cuts creating extremely low turbidity,” said DuWayne Richert , Regional Sales Manager, Ellicott Dredge Technologies, LLC.

The Mud Cat 40E was shipped from EDT’s factory in New Richmond, WI to Port of Seattle, WA and then ferried in a 40 ft. ocean container via Samson Tug and Barge to Port of Valdez, AK which required more logistical planning than most domestic Mud Cat shipments.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

12 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

12 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

13 days ago