Share this article
The Queen Pool Lake Dredge restoration project is complete, according to the Blenheim Palace.

Share this article
The Queen Pool Lake Dredge restoration project is complete, according to the Blenheim Palace.
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
Land & Water has been working tirelessly around the clock collecting over 300,000 cubic metres of silt and restoring the Queen Pool back to its original depth.
The project, which began in April 2022, included using three diggers set on a floating platform which moved slowly across the full surface of the lake. Along with the diggers, the contractor deployed six hoppers to move the silt from the platform to land.
The dredged material was then hauled up to the Great Park, creating a landform (a hill or mound) over 16ha. Eventually, this land will be returned to the grassland.
about 1 year ago
about 2 years ago
The Queen Pool Lake Dredge restoration project is complete, according to the Blenheim Palace. Land & Water has been working tirelessly around the clock collecting over 300,000 cubic metres of silt and restoring the Queen Pool back to its original depth. The project, which began in April 2022, includ