Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›McLaughlin & Harvey improving marine infrastructure in Douglas Harbour
McLaughlin & Harvey improving marine infrastructure in Douglas Harbour

Share this article

McLaughlin & Harvey recently won a major engineering project designed to protect critical marine infrastructure in Douglas Harbour, Isle of Man.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

InfrastructurePort DevelopmentPorts & Logistics

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago

The alterations to King Edward VIII Pier include the installation of two new large steel piles around the end of the pier, as well as the installation three new 100-ton mooring bollards close to the linkspan, and modifying the fenders which prevent a vessel from colliding with the harbour wall.

Work will start in early September 2023 and is scheduled for completion in the new year 2024.

The improvements are necessary due to the arrival of the Isle of Man Steam Packet Company’s new vessel, Manxman. They also form part of the wider Harbour Strategy approved by Tynwald in 2018, which included an upgrade to the King Edward VIII Pier to accommodate a larger vessel as a replacement for the Ben-my-Chree.

While Manxman has been designed specifically for Douglas Harbour and can be berthed and manoeuvred exactly as planned, it is 8m longer and 3m wider than the Ben-my-Chree and weighs almost twice as much; 24,161 tonnes compared to 12,504 tonnes.

Fenders and mooring bollards will therefore be replaced and strengthened to reduce the risk of damage to both the pier and new vessel during Force 10 winds.

Works also include repairs to the pier wall, and the placement of rock bags to provide protection for the pier from underwater scour caused by the fast moving water around the vessel’s propellers.

Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago

Infrastructure

September 14, 2023 · about 2 years ago

McLaughlin & Harvey improving marine infrastructure in Douglas Harbour

McLaughlin & Harvey recently won a major engineering project designed to protect critical marine infrastructure in Douglas Harbour, Isle of Man. The alterations to King Edward VIII Pier include the installation of two new large steel piles around the end of the pier, as well as the installation thre

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins