Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Moving into phase 2 of the HNC Lock Complex
Infrastructure

February 22, 2024 · about 2 years ago

Moving into phase 2 of the HNC Lock Complex

The Louisiana Coastal Protection and Restoration Authority (CPRA) and the Terrebonne Levee & Conservation District (TLCD) have announced that the Houma Navigation Canal (HNC) Lock Complex project is moving into Phase 2 construction. TLCD awarded the construction contract, valued at more than $300 mi

2 minutes read
  • LinkedIn
  • X
  • Email
Moving into phase 2 of the HNC Lock Complex

Share this article

The Louisiana Coastal Protection and Restoration Authority (CPRA) and the Terrebonne Levee & Conservation District (TLCD) have announced that the Houma Navigation Canal (HNC) Lock Complex project is moving into Phase 2 construction.

TLCD awarded the construction contract, valued at more than $300 million, to SeaLevel Construction, Inc., a Louisiana-based company headquartered in Thibodaux.

The HNC Lock Complex is a large-scale hydrologic restoration project that will help limit saltwater intrusion and distribute freshwater within the Terrebonne Basin, allowing for the maintenance of thousands of acres of wetlands, which serve as critical wildlife habitat and nurseries for fisheries.

Once constructed, the HNC Lock Complex will span 110 feet across and stand 800 feet high with gates on either side, directly adjacent to the existing 250-foot-wide Bubba Dove barge floodgate.

The two components will be tied together by a braced flood wall across the channel and work in concert to allow larger ships to pass through the canal. The HNC Lock Complex will also close one of the few remaining gaps of the Morganza to the Gulf hurricane protection system, which uses a mix of levees, floodgates, and locks to protect 150,000 Terrebonne and Lafourche residents from potentially deadly storm surge.

Phase 2 includes construction of Inland and Gulf-side gates as well as the lock chamber to complete the HNC Lock Complex. The Phase 2 portion also includes the completion of the operations area, the control building, and the 175-foot control building access bridge.

This phase also consists of hydraulically dredging approximately 135,000 cubic yards of material from the HNC to reestablish 15 acres of brackish marsh habitat, benefiting the area’s ecosystem and wildlife.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago