Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›More time to comment the MKARNS 12-foot channel deepening project
Business development

February 23, 2024 · about 2 years ago

More time to comment the MKARNS 12-foot channel deepening project

The U.S. Army Corps of Engineers, Little Rock District is extending public comment period for the draft Supplemental Environmental Assessment and draft Finding of No Significant Impact for the McClellan–Kerr Arkansas River Navigation System (MKARNS) 12-foot Channel Deepening Project. According to US

1 minutes read
  • LinkedIn
  • X
  • Email
More time to comment the MKARNS 12-foot channel deepening project

Share this article

The U.S. Army Corps of Engineers, Little Rock District is extending public comment period for the draft Supplemental Environmental Assessment and draft Finding of No Significant Impact for the McClellan–Kerr Arkansas River Navigation System (MKARNS) 12-foot Channel Deepening Project.

According to USACE, the comment period is being extended due to unforeseen circumstances. The extension will ensure full public participation and allow the public more time to send in their responses.

The aim of the Project is to increase the navigation channel to a minimum navigable depth of 12-feet throughout the MKARNS.

Deepening the channel is set to allow the existing inland commercial fleet to sail at deeper drafts that are consistent with those on the Lower Mississippi River.

The project will require placing rock structures to scour the channel, dredging the channel and utilizing in-water and upland dredge disposal sites throughout the project area.

The deadline to send comments on the proposed MKARNS 12-foot Channel Deepening Project is March 10.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago