Share this article
The Boskalis’ trailing suction hopper dredger (TSHD) Strandway underwent a 2.5-week drydocking project at the Damen Harlingen shipyard last week.
Throughout the project, overseen by the V.H.F.R. Group, the team multitasked and provided guidance and support to the crew where necessary, assisting with various tasks, including welding and drawing preparation.
V.H.F.R. Group also supervised the installation of icaf anodes and aluminum anodes, box coolers, and hydraulic engineering jobs such as replacing bottom door cylinders, etc.
