Share this article
Pilbara Ports said that they will be undertaking land reclamation work later this year on the Lumsden Point project in the Port of Port Hedland using a cutter suction dredger (CSD).

Share this article
Pilbara Ports said that they will be undertaking land reclamation work later this year on the Lumsden Point project in the Port of Port Hedland using a cutter suction dredger (CSD).
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
A CSD cuts the seabed material and mixes it with water to create a slurry which is then pumped into the land reclamation area.
The land reclamation area is bounded by a rock wall lined with geotextile and grit material to ensure all material remains inside.
The good coarse material is used to create new land and the finer/silty or unsuitable material will flow into the pump pit.
According to Pilbara Ports, the pump pit has a series of pumps which will pump this silty water to a silt settlement area approximately three kilometres away where it will be given time to settle, so the clean water can be returned to the waterway, which will be monitored to ensure it meets a high level of ecological protection.
25 days ago
about 2 years ago
Pilbara Ports said that they will be undertaking land reclamation work later this year on the Lumsden Point project in the Port of Port Hedland using a cutter suction dredger (CSD). A CSD cuts the seabed material and mixes it with water to create a slurry which is then pumped into the land reclamati