Share this article
Recent hurricanes and northeasters have severely eroded South Ponte Vedra Beach (SPV).

Share this article
Recent hurricanes and northeasters have severely eroded South Ponte Vedra Beach (SPV).
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
The St. Johns County (FL) is working on a project that will replenish the eroded beach and protect the shoreline.
According to the officials, the southern end of this dredge project will tie in with the recently completed northern end of the Army Corps Coastal Storm Risk Management (CSRM) project. The proposed project sand placement volume is 610,000 cubic yards (about 22 cy/ft. on average).
The design calls for a dune with a crest width of 15 ft. and an elevation varying between 14 and 16.5 ft. NAVD alongshore, and a berm with a width varying between 30 and 40 ft. and an elevation varying between 10 and 12.5 ft. NAVD alongshore.
The County is in the process of procuring an Engineering firm for the project. The contract is expected to be presented to the Board of County Commissioners for approval in May 2024.
10 days ago
about 2 years ago
Recent hurricanes and northeasters have severely eroded South Ponte Vedra Beach (SPV). The St. Johns County (FL) is working on a project that will replenish the eroded beach and protect the shoreline. According to the officials, the southern end of this dredge project will tie in with the recently c