Share this article
Pensar Infrastructure Group completed the design and construction of the SeaLink Marine & Tourism Vehicle Ferry Terminal Stage 1 upgrade at Redland Bay recently.
The scope of works included:
To future proof the asset, SeaLink’s requirements included expanding the existing terminal by increasing the number of vehicular loading spaces, loading lanes and check in area capacity.
