Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Test dredging underway for Tahkoluoto offshore wind farm extension
Dredging

May 14, 2024 · about 2 years ago

Test dredging underway for Tahkoluoto offshore wind farm extension

Suomen Hyötytuuli conducted test dredging off the coast of Pori at the Sea of Bothnia – the site of the Tahkoluoto offshore wind farm extension project – earlier this month. In this area (located between 4 and 22km off the coast), the company plans to build a 600+ MW expansion to the existing 44.3 M

1 minutes read
  • LinkedIn
  • X
  • Email
Test dredging underway for Tahkoluoto offshore wind farm extension

Share this article

Suomen Hyötytuuli conducted test dredging off the coast of Pori at the Sea of Bothnia – the site of the Tahkoluoto offshore wind farm extension project – earlier this mont h .

In this area (located between 4 and 22km off the coast), the company plans to build a 600+ MW expansion to the existing 44.3 MW offshore wind farm, the world’s first built and operating in frozen sea conditions.

The new facility is planned to comprise 40 wind turbines of more than 15 MW capacity each, installed at a depth of up to 40m.

“The test dredging has provided valuable information about the quality of the seabed of the Sea of Bothnia and about the suitable equipment and methods for dredging in the area. It has also provided insight as to how deep the dredging needs to go in order to establish sufficiently robust foundations for the offshore wind turbines cost-efficiently and in compliance with the criteria,” Suomen Hyötytuuli said in a press release on 13 May.

The latest test work follows the site investigations launched last year, when the Dutch-Finnish consortium Boskalis-Terramare and the Finish Hyötytuuli performed seabed test excavations at a depth of 43 metres.

According to Suomen Hyötytuuli, the construction of the extension offshore wind farm is expected to take place in 2027–2029.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago