Share this article
The U.S. Army Corps of Engineers, Mobile District has awarded a $30 million contract to Inland Dredging of Dyersburg, Tennessee, for dredging works in Alabama, Florida and Mississippi.
According to the Corps, the contractor will provide 24-Inch cutterhead pipeline dredge and attendant plant to support the Mobile District’s need to perform annual maintenance dredging at various shoaling locations.
These areas include the Federal navigation projects of Black Warrior & Tombigbee Rivers (BW&T), Tennessee-Tombigbee Waterway (Tenn-Tom), Gulf Intracoastal Waterway (GIWW), Biloxi Harbor, and Mobile River.
The dredging locations will be identified based on channel conditions and the need to restore specific reaches to their project depth.
