Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Beach Nourishment›Spotlight on Glenelg to Kingston Park sand recycling
Beach Nourishment

August 22, 2024 · about 1 year ago

Spotlight on Glenelg to Kingston Park sand recycling

The Government of South Australia’s Department for Environment and Water is getting ready to move sand from Glenelg to Kingston Park beaches. This is required to reverse the natural transport of sand along the beach system in a northward direction, accumulating in the Glenelg area. Before moving the

1 minutes read
  • LinkedIn
  • X
  • Email
Spotlight on Glenelg to Kingston Park sand recycling

The Government of South Australia’s Department for Environment and Water is getting ready to move sand from Glenelg to Kingston Park beaches. This is required to reverse the natural transport of sand along the beach system in a northward direction, accumulating in the Glenelg area.

Before moving the sand, they are removing beach wrack at Glenelg. Beach wrack is debris, including seaweed, algae and sponges, which washes up on the shore.

According to the Government, these natural materials are important for the environment, so we move the wrack to other beaches where it helps protect the sand dunes.

Numerous Glenelg Jetty pylons are currently being repaired and this is anticipated to be finished next week.

Once the repairs are complete, it will be possible to install the seawater pumping system used to mix seawater with the sand that is transported to beaches south of Glenelg all the way to Kingston Park through the sand pumping pipeline.

“ We will soon start moving sand from the beach north of the jetty, where it will be sieved before being mixed with seawater and pumped through the pipeline ,” said the Government.

The Department for Environment and Water has worked with construction engineering firm McConnell Dowell since 2013 to undertake this work on an annual basis.

The work is required to protect the coastline, keep foreshore infrastructure safe and provide sandy beaches for the community to enjoy.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Beach Nourishment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago
Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago