Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Lower Columbia River Dredged Material Management Plan
Dredging

October 29, 2024 · about 1 year ago

Lower Columbia River Dredged Material Management Plan

The U.S. Army Corps of Engineers, Portland District has released public notice of proposed discharges of dredged and fill material for the Lower Columbia River Channel Maintenance works. According to the notice, USACE proposes to discharge dredged and fill material during implementation of a Dredged

1 minutes read
  • LinkedIn
  • X
  • Email
Lower Columbia River Dredged Material Management Plan

Share this article

The U.S. Army Corps of Engineers, Portland District has released public notice of proposed discharges of dredged and fill material for the Lower Columbia River Channel Maintenance works.

According to the notice, USACE proposes to discharge dredged and fill material during implementation of a Dredged Material Management Plan and integrated Environmental Impact Statement (DMMP-EIS) for the purpose of maintaining the congressionally authorized channel dimensions of the Lower Columbia River (LCR) Federal Navigation Channel (FNC), part of the Columbia and Lower Willamette Rivers (C&LW) Project.

LCR FNC maintenance dredging would occur annually utilizing a variety of dredge equipment. The intent of maintenance dredging is to reduce impediments to navigation by dredging to authorized dimensions, plus advanced maintenance dredging (AMD).

The overall purpose of the DMMP-EIS is to define the dredged material management practices for the LCR FNC to maintain the authorized dimensions for a minimum of 20 years.

The forecasted average volume of material needed to be dredged to maintain the authorized dimensions for the next 20 years is expected to be 9.2 million cubic yards annually. The channel is typically maintained using hydraulic (hopper and pipeline) dredges but mechanical dredges with material placement barges can also be used.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago