Share this article
Virginia Port Authority (VPA) has announced plans to perform maintenance dredging of its facilities on the Elizabeth River, the Norfolk International Terminal-North (NNIT) and Norfolk International Terminal-South (SNIT).

Share this article
Virginia Port Authority (VPA) has announced plans to perform maintenance dredging of its facilities on the Elizabeth River, the Norfolk International Terminal-North (NNIT) and Norfolk International Terminal-South (SNIT).
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
The deepening and widening of the approach channel and berthing areas is aimed to provide safe navigation for the Ultra Large Container Vessels.
The proposed project includes dredging of the entire area from previously permitted -52 ft MLLW to a new maximum depth of -58 ft MLLW.
Also, the project calls for new dredging to widen the NNIT approach channel on both the North (1.70 acres) and the South (4.80 acres) of the approach channel to a maximum depth of -58 ft MLLW.
VPA estimates that approximately 5.35 million cubic yards of material will be removed from the 234.27 acre NIT site (North and South) during the 10-year maintenance cycle with approximately 3.35 million cubic yards of dredged material removed initially and 1.0 million cubic yards of dredged material removed per 5 year maintenance cycle.
More Info
10 days ago
about 1 year ago
Virginia Port Authority (VPA) has announced plans to perform maintenance dredging of its facilities on the Elizabeth River, the Norfolk International Terminal-North (NNIT) and Norfolk International Terminal-South (SNIT). The deepening and widening of the approach channel and berthing areas is aimed