Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›ENTACT: Revitalizing Wilcox and Phoenix Lakes
Dredging

November 21, 2024 · about 1 year ago

ENTACT: Revitalizing Wilcox and Phoenix Lakes

In the heart of the Rouge River Area of Concern (AOC), two ambitious habitat restoration projects – at Wilcox Lake and Phoenix Lake – are bringing new life to these vital bodies of water. Spearheaded by ENTACT and funded through partnerships with the U.S. Environmental Protection Agency’s Great Lake

1 minutes read
  • LinkedIn
  • X
  • Email
ENTACT: Revitalizing Wilcox and Phoenix Lakes

In the heart of the Rouge River Area of Concern (AOC), two ambitious habitat restoration projects – at Wilcox Lake and Phoenix Lake – are bringing new life to these vital bodies of water.

Spearheaded by ENTACT and funded through partnerships with the U.S. Environmental Protection Agency’s Great Lakes National Program Office (GLNPO) and the Wayne County Parks District, these projects are tackling the long-standing environmental challenges of water quality degradation and habitat loss.

A major component of the Wilcox Lake restoration was dredging the lakebed to remove decades of accumulated contaminated sediment.

This process is critical for creating clean, deep-water areas where fish can spawn and thrive.

Over the course of the project, ENTACT removed over 9,000 tons of sediment, covering approximately 56,000 square feet of the lakebed. All sediment was solidified using ENTACT in-barge polymerization process which eliminated the need for upland processing.

At Phoenix Lake, the placement of sand spawning beds extended over more than two acres, creating ideal conditions for fish to reproduce and supporting the overall health of the aquatic ecosystem.

In total, more than 3,400 tons of MDOT Class II sand were placed across the lake, complementing the work done at Wilcox Lake.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago