Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›DNREC begins emergency dredging work at Indian River Inlet
Dredging

November 26, 2024 · about 1 year ago

DNREC begins emergency dredging work at Indian River Inlet

The Delaware Department of Natural Resources and Environmental Control (DNREC) has initiated an emergency dredging project to restore the severely eroded beach area north of the Indian River Inlet. The project is necessary to protect critical transportation infrastructure, including Coastal Highway,

1 minutes read
  • LinkedIn
  • X
  • Email
DNREC begins emergency dredging work at Indian River Inlet

The Delaware Department of Natural Resources and Environmental Control (DNREC) has initiated an emergency dredging project to restore the severely eroded beach area north of the Indian River Inlet.

The project is necessary to protect critical transportation infrastructure, including Coastal Highway, which serves as an emergency evacuation route, said DNREC.

As part of the dredging and beach nourishment work, the north side beach at Delaware Seashore State Park will be temporarily closed to ensure public safety.

DNREC added that they will monitor the situation and work with the contractors to reopen this area when it is deemed to be safe for park visitors and surfers.

Under the program, up to 380,000 cubic yards of sand from a shoal on the south side of the Indian River Inlet will be dredged and used to rebuild the beach and dune system.

Also, dredged material will be transported via pipeline and screened for munitions and explosives of concern prior to placement on the beach. Sand is to be spread and graded to rebuild the dune system to an overall elevation of 16 feet by 25 feet wide.

The beach will be constructed to an elevation of 9.2 feet, or about 7 feet above the average high tide, and width of approximately 100 feet. The final beach width will be determined by the available dredge volume, concluded DNREC.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago