Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Barcelona Harbor advance maintenance dredging project
Dredging

February 12, 2025 · about 1 year ago

Barcelona Harbor advance maintenance dredging project

The U.S. Army Corps of Engineers is proposing to perform advance maintenance dredging project in Barcelona Harbor, NY. In recent years, the harbor has experienced extreme shoaling. Wave action is pushing littoral sediment over the west breakwater and into the navigation channel. It is now common for

1 minutes read
  • LinkedIn
  • X
  • Email
Barcelona Harbor advance maintenance dredging project

Share this article

The U.S. Army Corps of Engineers is proposing to perform advance maintenance dredging project in Barcelona Harbor, NY.

In recent years, the harbor has experienced extreme shoaling. Wave action is pushing littoral sediment over the west breakwater and into the navigation channel. It is now common for shoals to build up over eight feet above the water surface due to this wave action.

The quantity of littoral sediment is dependent on the amount of ice cover on Lake Erie throughout the winter, and the intensity and wind direction of storm events.

The scope of this work includes routine maintenance dredging, with an expansion of the area and depth that is dredged to maintain the federal navigation channel.

It is proposed that the scope of the maintenance dredging extend one-foot deeper than the authorized depths and extend ten feet wider than the authorized limits along the western limits of the channel.

These expanded limits are proposed as “Advance Maintenance” dredge areas in accordance with USACE Engineering Regulation 1130-2-520, which states that: “Advance maintenance dredging, to a specified depth and/or width, may be performed in critical and/or fast-shoaling areas to avoid frequent re-dredging and ensure the least overall cost of maintaining the project”.

Advance maintenance dredging in critical channel areas may increase the time before the channel requires maintenance again by two years.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

14 days ago