Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Cape Town gearing up for the Zeekoevlei dredging work
Dredging

March 24, 2025 · about 1 year ago

Cape Town gearing up for the Zeekoevlei dredging work

The City of Cape Town has announced that preparations are underway for the dredging of Zeekoevlei, an operation that will take about two years and improve the quality of the waterbody. If all goes as planned, the physical dredging of two sections of Zeekoevlei will commence in May 2025. “Improving t

1 minutes read
  • LinkedIn
  • X
  • Email
Cape Town gearing up for the Zeekoevlei dredging work

Share this article

The City of Cape Town has announced that preparations are underway for the dredging of Zeekoevlei, an operation that will take about two years and improve the quality of the waterbody.

If all goes as planned, the physical dredging of two sections of Zeekoevlei will commence in May 2025.

“ Improving the water quality at Zeekoevlei is one of our top priorities, and I am pleased to announce that after many months of preparations we are now at the point where the contractor is on site, getting the necessary infrastructure in place to commence with the dredging ,” said Deputy Mayor and Mayoral Committee Member for Spatial Planning and Environment, Alderman Eddie Andrews . “ The dredging of Zeekoevlei will also assist in removing pollutants and improving the overall health of this ecosystem .”

The intention is to dredge and remove as much of the nutrient rich sediment as possible over a period of two years.

Two sections of Zeekoevlei will be dredged: first Storm Bay and thereafter the contractor will move to the section known as Home Bay. The dredged material will be pumped with a slurry pipeline from Zeekoevlei to dewatering ponds where the sediment can dry out.

The total volume of sediment to be dredged from Home Bay is 157 000m³, estimated to take about 14 months, and from Storm Bay is 207 000m³, estimated to take about 12 months.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

14 days ago