Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Beach Nourishment›Harvey Cedars beachfill work underway
Beach Nourishment

May 1, 2025 · about 1 year ago

Harvey Cedars beachfill work underway

Great Lakes Dredge & Dock Company (GLDD) is currently conducting dredging and beachfill operations in Harvey Cedars, N.J. According to USACE, this work is designed to maintain the dune and berm system, which serves to reduce the risk of coastal storm damages. The sand is being pumped onto the beach

1 minutes read
  • LinkedIn
  • X
  • Email
Harvey Cedars beachfill work underway

Great Lakes Dredge & Dock Company (GLDD) is currently conducting dredging and beachfill operations in Harvey Cedars, N.J.

According to USACE, this work is designed to maintain the dune and berm system, which serves to reduce the risk of coastal storm damages.

The sand is being pumped onto the beach at a number of the most eroded portions within Harvey Cedars.

Dune crossovers/access paths, fencing, dune grass planting, and other features will be installed/repaired as part of the contract.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Beach Nourishment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

USACE wraps up Lake Montauk channel dredging
Beach Nourishment

USACE wraps up Lake Montauk channel dredging

13 days ago

Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

USACE wraps up Lake Montauk channel dredging
Beach Nourishment

USACE wraps up Lake Montauk channel dredging

13 days ago
Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago
Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago