Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Beach Nourishment›Fernandina Beach renourishment faces short delay
Beach Nourishment

May 12, 2025 · about 1 year ago

Fernandina Beach renourishment faces short delay

The start of construction of the second periodic renourishment of Fernandina Beach is expected to be delayed for one to two days, due to present and projected rough seas interfering with the safe installation of the dredge pipe, offshore. “When working on projects of this magnitude, safety always co

1 minutes read
  • LinkedIn
  • X
  • Email
Fernandina Beach renourishment faces short delay

The start of construction of the second periodic renourishment of Fernandina Beach is expected to be delayed for one to two days, due to present and projected rough seas interfering with the safe installation of the dredge pipe, offshore.

“ When working on projects of this magnitude, safety always comes first, and Mother Nature gets the final vote ,” USACE’s Jacksonville District said.

As soon as it is determined that the pipe may be safely installed offshore, construction will start and continue 24/7, outside of delays due to weather.

According to USACE, sand will be pumped onto the beach from offshore and graded into place by bulldozers and other equipment.

Sections of the beach will be closed off while working in approximately 2,000 ft intervals.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Beach Nourishment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

USACE wraps up Lake Montauk channel dredging
Beach Nourishment

USACE wraps up Lake Montauk channel dredging

13 days ago

Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

USACE wraps up Lake Montauk channel dredging
Beach Nourishment

USACE wraps up Lake Montauk channel dredging

13 days ago
Rohde Nielsen completes coastal protection works in Tarragona
Beach Nourishment

Rohde Nielsen completes coastal protection works in Tarragona

14 days ago
Ocean City beach nourishment: Dredger Illinois begins sand pumping operations
Beach Nourishment

Ocean City beach nourishment: Dredger Illinois begins sand pumping operations

18 days ago