Share this article
St. Johns County, Florida, recently held a public meeting to discuss the Porpoise Point Shoreline Stabilization Project.

Share this article
St. Johns County, Florida, recently held a public meeting to discuss the Porpoise Point Shoreline Stabilization Project.
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
The project is currently in the design and permitting phase and seeks to develop a solution to prevent future erosion of the Porpoise Point shoreline to protect upland property and infrastructure.
The inlet shoreline of Porpoise Point has been experiencing unpredictable, episodic erosion, causing the exposure of residential building foundations and underground public utilities, flooding the right of way, and reducing or eliminating recreational space.
The current phase of this project will support the design, engineering, and permitting required to develop a solution to reduce coastal storm damage to this area from future storm events and reduce erosion.
The preliminary design will include constructing a hard armor structure to help trap the sand on the shoreline and prevent further erosion.
This Permitting, Design, and Engineering phase of the project is expected to be completed by the fall/winter of 2026.
10 days ago
about 1 year ago
St. Johns County, Florida, recently held a public meeting to discuss the Porpoise Point Shoreline Stabilization Project. The project is currently in the design and permitting phase and seeks to develop a solution to prevent future erosion of the Porpoise Point shoreline to protect upland property an