Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Tuttle Creek Lake dredging project starting this summer
Dredging

May 27, 2025 · about 1 year ago

Tuttle Creek Lake dredging project starting this summer

The U.S. Army Corps of Engineers and the contractors are making final preparations for a unique water injection dredging project at Tuttle Creek Lake. According to the Army Corps, the water injection dredging study and demonstration at Tuttle Creek Lake is set to begin this summer. The Kansas Water

1 minutes read
  • LinkedIn
  • X
  • Email
Tuttle Creek Lake dredging project starting this summer

Share this article

The U.S. Army Corps of Engineers and the contractors are making final preparations for a unique water injection dredging project at Tuttle Creek Lake.

According to the Army Corps, the water injection dredging study and demonstration at Tuttle Creek Lake is set to begin this summer.

The Kansas Water Office (KWO), in partnership with the Corps of Engineers and Michels Construction, will implement the Water Injection Dredging (WID) demonstration project at Tuttle Creek Lake to promote sustainable long-term reservoir sediment management.

WID is a process in which large volumes of water are injected at low pressure into the sediment bed near the bottom of the reservoir through the use of pumps and a series of nozzles located on a horizontal pipe positioned above the sediment bed.

The injected water effectively fluidizes the sediment creating a ‘ density current’ that allows the sediment to flow by gravity to deeper areas.

In the case of Tuttle Creek Lake, the proposed WID demonstration project is aimed at moving the sediment toward the existing low level outlet in the dam and monitoring the flow of the density current through the outlet during controlled discharges.

Successful demonstration of WID technology at Tuttle Creek Lake will help to advance other innovative methods aimed at extending the life of reservoir storage in Kansas, including the use of WID with hydrosuction or other sustainable sediment management techniques.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago