The work on the entrance to the Fehmarnbelt tunnel at Rødbyhavn on Lolland is almost complete.
The transition between the motorway and the railway on land and the tunnel underwater takes place via the so-called tunnel portal, which has been under construction since 2022. The tunnel sections built on land are now being covered with earth. The Danish tunnel portal with its 160-metre-long cut-and-cover tunnel is nearing completion as the structure is gradually being covered.

