Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›USACE builds island to reduce wave fetch
Infrastructure

October 6, 2025 · about 9 months ago

USACE builds island to reduce wave fetch

The U.S. Army Corps of Engineers, St. Paul District, is constructing an island upstream from the embankment at Lock and Dam 2 on the Mississippi River to safeguard the existing embankment from wind and wave erosion. The 3,250-foot-long earthen embankment was constructed in 1930 and has since suffere

1 minutes read
  • LinkedIn
  • X
  • Email
USACE builds island to reduce wave fetch

The U.S. Army Corps of Engineers, St. Paul District, is constructing an island upstream from the embankment at Lock and Dam 2 on the Mississippi River to safeguard the existing embankment from wind and wave erosion.

The 3,250-foot-long earthen embankment was constructed in 1930 and has since suffered degradation due to weather conditions, lack of vegetation and the erosive effects of high-water events.

The island will provide habitat benefits including tall grasses, tree plantings, a wetland, rock features and an overwintering fish habitat.

According to USACE, this work is anticipated to be done this fall.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Manson nabs $12.9M Oakland dredging deal
Business development

Manson nabs $12.9M Oakland dredging deal

10 days ago

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Manson nabs $12.9M Oakland dredging deal
Business development

Manson nabs $12.9M Oakland dredging deal

10 days ago
Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago